Flow Assurance Practical Training in Port Harcourt
99% Practical Oriented Training
For contact and training venue in Port Harcourt call
Port Harcourt
IK Idegwue , Tel: 08032766980
Address: 71 Ada George Road, Port Harcourt
For further enquiry contact us:
Tel: +234 - 813 3476 558, +234 - 708 574 0887,
Opebi Allen Ikeja, Lagos State, Nigeria
Email:
[email protected],
[email protected]
Website:
www.vogwconcept.com COURSE OUTLINE MODULE 1 1.0. Fluid Properties and Phase behaviour modeling 1.1. Component of production system 1.2. Flow assurance concerns that need to be examined: - Pipeline rupture from corrosion
- Pipeline blockage from hydrates or wax
- Severe slugging can damage separator
- Large pressure drop in pipelines can cause lower flow than should be
MODULE 2 2.1. Flow assurance strategies that need to be adopted: - Hydraulic Analysis – acceptable pressure drops, pipeline size, erosion & corrosion limits
- Thermal Analysis – temperature distribution, heat loss
- Inhibition Analysis – hydrate inhibitors, wax inhibitors, corrosion inhibitors, scale inhibitors
2.2. Flow assurance strategies Terms
· Beggs and Brill method
· Volume fraction, holdup and water cut
· Superficial velocity
· Mixture velocity and density
· Mass conservation
· Momentum conservation
· Energy conservation
· Mass transfer between phases
· Subsonic vs. transonic, supersonic and hypersonic flows
MODULE 3 3.1. Steady State Design: - Hydraulics
- Line Sizing
- Pressure Drop
- Max./Min. Velocity
- Flow Regime Prediction
- Slugging (Hydrodynamic and Severe Slugging)
- Pots equation for Severe Slugging (or Terrain Slugging)
- Mean Slug Length and Probabilistic Model for
- Slug Length (Hill & Wood Method)
- Maximum Slug Length = 6 times the mean slug length
- Slug Frequency (Hill & Wood Method)
3.2· Pigging slugs
o A quasi-transient model of Baker – McDonald
- Thermal
- Insulation Requirements:
- Hydrate Formation
- Wax Deposition
- Insulation Types
- Pipe-in-Pipe
- Wet Insulation
- Flexible Pipe
MODULE 4 4.1 Transient Design: - Shut Down
- Depressurisation
- Blow Down
- Turn Down – Ramp up (For Gas Condensate Systems)
- Start-up
- Cold Start-up
- Warm Start-up
- Interrupted Start-up
- Pigging
- Presentation of Result and Project reporting
- Project work/ Case study
For contact and training venue in Port Harcourt call
IK Idegwue
Tel: 08032766980
71 Ada George Road, Port Harcourt
For further enquiry contact us:
Tel: +234 - 813 3476 558, +234 - 708 574 0887,
Opebi Allen Ikeja, Lagos State, Nigeria
Email:
[email protected],
[email protected]
Website:
www.vogwconcept.com